• <small id="eeiww"><td id="eeiww"></td></small><small id="eeiww"><td id="eeiww"></td></small>
  • <xmp id="eeiww"><small id="eeiww"></small><xmp id="eeiww"><td id="eeiww"></td>
  • <xmp id="eeiww"><xmp id="eeiww">
  • <td id="eeiww"></td>
  • <small id="eeiww"></small>
  • <td id="eeiww"></td>
  • Your location: Home > Project Case >

    Product Center

    Service Hotline

    0512-52122998

    Project Case

    800kv DC upward line large span steel tube combined tower
        In 2009, our company won the bid for the general line tower and the Yangtze River large span steel pipe tower of the 800kv Xiangjiaba-Shanghai UHV DC transmission line project. The total contract volume of the general line tower is 19898 tons. The contract weight of the project is 2160 tons, the height of the large span tower is 192M, the total height is 202M, and the single base weight is 920 tons.

    Business Division 1:0512-52401555

    Division 2:0512-52409898

    Product details
    800kv DC upward line large span steel tube combined tower
        In 2009, our company won the bid for the general line tower and the Yangtze River large span steel pipe tower of the 800kv Xiangjiaba-Shanghai UHV DC transmission line project. The total contract volume of the general line tower is 19898 tons. The contract weight of the project is 2160 tons, the height of the large span tower is 192M, the total height is 202M, and the single base weight is 920 tons.
    Previous:Nothing
    Next:Tower Erection in Australia 230KV double circuit angle steel tower
    熟妇高潮精品一区二区三区
  • <small id="eeiww"><td id="eeiww"></td></small><small id="eeiww"><td id="eeiww"></td></small>
  • <xmp id="eeiww"><small id="eeiww"></small><xmp id="eeiww"><td id="eeiww"></td>
  • <xmp id="eeiww"><xmp id="eeiww">
  • <td id="eeiww"></td>
  • <small id="eeiww"></small>
  • <td id="eeiww"></td>